search form

search form

Select Research area & RI category

Select country

  • MERIL
  • euro planet 2024
154kV Verification Testing Line and Intelligent Facility of Transmission
Facility name
Hosting Legal Entity
Korea Electric Power Corporation(KEPCO)
Contact
mrsky@kepco.co.kr  Send E-Mail
RI Category
Electrical and Optical Engineering Facilities
RI Keywords
Polymer insulation, new power transmission lines, transmission
TRL
  1. Basic Technology
    Research
    1단계 2단계
  2. Research to Prove
    Feasibility
    3단계 4단계
  3. Technology
    Demonstration
    5단계 6단계
  4. System/Subsystem
    Development
    7단계 8단계
  5. System Test
    Launch &
    Operaions
    9단계
Description
3 DAY + 1PREP

-New power transmission technology with considering the environmental issues, the 154kV demonstration testing process and development of reliable verification of transmission and transformation equipment with building underground power lines -Localization of equipment, validation reliability of new equipment developments, infrastructure for efficient evaluation
Application Area
-Design of a comprehensive system, build 154kV line -Environmentally friendly and applying new materials such as polymer insulation for empirical tests of new compact transmission tower development -Power equipment monitoring technology research -Reliability evaluation of new developments in form of 154kV
Specifications

Equipment Component

Equipment Component

Provide name and model item

Name Model
no datas.

location

Jeonbuk, Korea

Photos